Oil Pipeline

Balan Atrush area

Oil Pipeline Project (12”)

Location

Balan Atrush area, Iraq

Completion

MAR - 2019

Scope

12" oil pipeline & auxiliary facilities

Client

Oil & Gas operator

In Balan Atrush, Shams AL-Furat executed a 12" oil pipeline to connect production facilities with downstream infrastructure. The project included challenging terrain crossings, safety-critical tie-ins and strict environmental protection measures across the full construction period.

Secure connection between field production and export network